Site visit details

Overview

Catchment Bunyip River
Site Sunshine Creek at Frankston school steps bridge, Mt Martha ME_ESU300
Date and Time Monday 4th November 2013 10:12am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 90 10 2400 7.7 0.01 16 10 10
Weather cloudy
Last rainfall During the last 24 hours 2
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Clear,Other: Slight orange tinge to water
Stream depth 51cm - 99cm
Stream width 2m - 5m
Hazards medium grade grassy slope
Litter/Pollutants cans,packets
Blackberry weeding conducted recently upstream of site, dead canes washed down into pond-age with last heavy creek flow.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au