Site visit details

Overview

Catchment Maribyrnong River
Site Jacksons Creek @ Emu Bottom Wetlands ME_MJA450
Date and Time Monday 11th November 2013 11:30am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 91.3498 9 600 8.4 0.05 19 16 0
Weather sunny
Last rainfall During the last week
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Stained brown
Stream depth
Stream width
Hazards
Litter/Pollutants

Phosphate returned to normal since last observation. Suspect a farmer applied superphosphate to his pasture.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au