Waterwatch Data Portal
EG_NIC060 Nicholson River - 500m upstream of backwater at surface
26 November 2013
Site visit details
Overview
Catchment | Nicholson River |
---|---|
Site | Nicholson River - 500m upstream of backwater at surface EG_NIC060 |
Date and Time | Tuesday 26th November 2013 08:40am |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Secchi m | Air ° C | Water ° C | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|
Sample | 55.8 | 13880 | 0.06 | 14 | 19.3 | 7 |
Weather | sunny |
---|---|
Last rainfall | During the last week 25 |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | Clear |
Stream depth | 3.4 |
Stream width | |
Hazards | |
Litter/Pollutants |
5 knot ne wind
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au