Waterwatch Data Portal
ME_DBC250 Blind Creek, 100 metres upstream of confluence of Dandenong Creek. In Boral, Scoresby.
26 July 2013
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Blind Creek, 100 metres upstream of confluence of Dandenong Creek. In Boral, Scoresby. ME_DBC250 |
Date and Time | Friday 26th July 2013 11:20am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.02 | 66 | 7.5 | 690 | 6.7 | 0.02 | 11 | 10 | 40 |
Weather | overcast |
---|---|
Last rainfall | More than a week ago 0 |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | Milky |
Stream depth | 51cm - 99cm |
Stream width | 2m - 5m |
Hazards | |
Litter/Pollutants |
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au