Waterwatch Data Portal
ME_ETO300 Toomuc Creek opposite the performing arts centre at Beaconhills College
3 December 2013
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Toomuc Creek opposite the performing arts centre at Beaconhills College ME_ETO300 |
Date and Time | Tuesday 3rd December 2013 16:00pm |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|
Sample | 7 | 340 | 7.5 | 0.03 | 23 | 21.8 | 18 |
Weather | sunny |
---|---|
Last rainfall | During the last 24 hours 1 |
Flow estimate | MEDIUM: flow is normal/typical average flow |
Water Appearance | Stained brown |
Stream depth | 0 - 50cm |
Stream width | 2m - 5m |
Hazards | leech |
Litter/Pollutants | other |
have to remove gate from stream.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au