Site visit details

Overview

Catchment Goulburn River
Site Fords Creek at Withers Lane before Wastewater Treatment Plan GB_FOR015
Date and Time Monday 14th October 2013 15:30pm
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L E coli orgs/100mL EC µS/cm pH pH Units Rain mm rP mg/L P Water ° C Coli orgs/100mL P mg/L Turb NTU
Sample 580 7.9 13 16
Weather
Last rainfall
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Smelly
Stream depth
Stream width
Hazards
Litter/Pollutants
2013 winter floods have created a barrier of flood debris across the creek about 50m downstream from the ford crossing. This has caused a ponding of the creek to about 70 m upstream from this new barrier. The remains of a dead cow could be seen about 10m DS from the ford crossing, where I sample at the DS edge of the ford crossing. All very smelly!

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au