Waterwatch Data Portal
GB_YEA025 Yea River after Yea at Providence Bridge
23 March 2013
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Yea River after Yea at Providence Bridge GB_YEA025 |
Date and Time | Saturday 23rd March 2013 14:50pm |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | Nitrate-Nit mg/L N | pH pH Units | Rain mm | rP mg/L P | Air ° C | Water ° C | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 27.25 | 95 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | MEDIUM: flow is normal/typical average flow |
Water Appearance | Muddy |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Level is falling. River is quite a "clayish" muddy colour after rainfall on 22nd March, but starting to drop now.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au