Site visit details

Overview

Catchment Bunyip River
Site Cannibal Creek at Pooley Rd, Tynong North ME_ECN100
Date and Time Saturday 28th December 2013 08:57am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N N mg/L NH4+ D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 129 6.3 0.03 18 14 15
Weather sunny
Last rainfall During the last week 4
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance Clear,Stained brown
Stream depth 0 - 50cm
Stream width 1.7
Hazards
Litter/Pollutants cans
No changes from last time. This monitoring was done 3 weeks late. These results sort of reflect the spring period.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au