Site visit details

Overview

Catchment Thomson River
Site Gleeson's Bridge WG_MFC260
Date and Time Saturday 27th July 2013 11:00am
Approved Approved

Notes

Physical Chemical Tests

EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 130 6.9 0.03 17.1 9.4 10
Weather sunny
Last rainfall During the last week
Flow estimate BANKFULL: High flow within channel capacity and in-stream habitats connected
Water Appearance Milky
Stream depth
Stream width
Hazards
Litter/Pollutants
water level is 1 foot higher than last testing.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au