Site visit details

Overview

Catchment Mitchell River
Site Lind Bridge EG_MIT540
Date and Time Saturday 1st February 2014 08:40am
Approved Approved

Notes

Physical Chemical Tests

D.O. % EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 95.7 2008 7.1 0.5 22.7 22.9 10
Weather overcast
Last rainfall During the last week 22
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Muddy,Stained brown
Stream depth 1m - 2m
Stream width >5m
Hazards
Litter/Pollutants

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au