Waterwatch Data Portal
ME_YDI800 Diamond Creek @ Edendale Environment Centre footbridge
13 February 2014
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Diamond Creek @ Edendale Environment Centre footbridge ME_YDI800 |
Date and Time | Thursday 13th February 2014 13:30pm |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.03 | 5 | 700 | 0.02 | 6.8 | 27.7 | 22.9 | 21 |
Weather | overcast |
---|---|
Last rainfall | More than a week ago 0.08 |
Flow estimate | STAGNANT: No continuous flow in channel but channel continuous (in-stream habitats connected) |
Water Appearance | Clear |
Stream depth | 0 - 50cm |
Stream width | 2m - 5m |
Hazards | |
Litter/Pollutants | bottles,cans,packets,other |
Six Pacific ducks enjoying the water. Creek levels reduced significantly due to little rainfall over past two months. Verges very dry and plants dying back.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au