Waterwatch Data Portal
ME_YKO030 Koonung Creek downstream of Bushy Creek confluence, under the footbridge
1 February 2014
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Koonung Creek downstream of Bushy Creek confluence, under the footbridge ME_YKO030 |
Date and Time | Saturday 1st February 2014 10:29am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.04 | 3.7 | 990 | 7.4 | 0.085 | 26.8 | 24.3 | 10 |
Weather | sunny |
---|---|
Last rainfall | |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | Muddy,Foamy/frothy |
Stream depth | 0 - 50cm |
Stream width | 2m - 5m |
Hazards | |
Litter/Pollutants |
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au