Waterwatch Data Portal
GB_LBT006 Lake Bartlett near culvert at South End
24 September 2013
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Lake Bartlett near culvert at South End GB_LBT006 |
Date and Time | Tuesday 24th September 2013 13:25pm |
Approved | Approved |
Physical Chemical Tests
Chem mg/L | D.O. % | D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Water ° C | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|
Sample | 253 | 7.4 | 0.02 | 21.9 | 58 |
Weather | sunny |
---|---|
Last rainfall | |
Flow estimate | PERMANENT: wetlands and lakes |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
weed/seed scum on top of water at this site DO meter unreliable - no results recorded sunny day - storms in the past week frogs calling
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au