Site visit details

Overview

Catchment Goulburn River
Site Murray River before entry of Goulburn River GB_MUR094
Date and Time Saturday 16th November 2013 13:30pm
Approved Approved

Notes

Physical Chemical Tests

Chem mg/L D.O. % D.O mg/L EC µS/cm Nitrate-Nit mg/L N Nitrate mg/L pH pH Units Rain mm Water ° C P mg/L Turb NTU
Sample 11 82 8.3 56 0.4 6.7 0 19.5 0.06 38
Weather
Last rainfall 0
Flow estimate BANKFULL: High flow within channel capacity and in-stream habitats connected
Water Appearance
Stream depth
Stream width
Hazards
Litter/Pollutants
H/F

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au