Site visit details

Overview

Catchment Barwon River
Site Harvey Park Drain (Harvey Estate Basin) CO_IND035
Date and Time Monday 24th March 2014 10:20am
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 33 3.2 520 7 15 15 200
Weather raining
Last rainfall During the last 24 hours 2.5
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance Scummy
Stream depth
Stream width
Hazards
Litter/Pollutants
Reactive Phosphorus too intense to record, even after dilution ie >0.14mg/l

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au