Site visit details

Overview

Catchment Goulburn River
Site King Parrot Creek at Flowerdale downstream of Moores Bridge. GB_KPC012
Date and Time Friday 25th April 2014 16:30pm
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm pH pH Units Rain mm rP mg/L P Water ° C P mg/L Turb NTU
Sample 100 0 11.6 10
Weather sunny
Last rainfall More than a week ago 63
Flow estimate LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected)
Water Appearance Clear
Stream depth 1m - 2m
Stream width >5m
Hazards
Litter/Pollutants

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au