Site visit details

Overview

Catchment Bunyip River
Site Sunshine Creek at outfall to Port Phillip Bay, Mt Martha ME_ESU450
Date and Time Monday 12th May 2014 11:00am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 80 8 3400 7.1 0.01 14 13 7
Weather sunny
Last rainfall During the last 24 hours 0.2
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Clear
Stream depth 0 - 50cm
Stream width 0.7
Hazards Steep slope next to roadside, uneven rocks on creek bank
Litter/Pollutants bottles,cans,packets,polystyrene

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au