Waterwatch Data Portal
ME_YPL693 Plenty River under Main Road (Circuit St) Bridge, Greensborough
1 May 2014
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Plenty River under Main Road (Circuit St) Bridge, Greensborough ME_YPL693 |
Date and Time | Thursday 1st May 2014 14:30pm |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 640 | 7.3 | 0.7 | 15.8 | 12.3 | 25 |
Weather | cloudy |
---|---|
Last rainfall | During the last 24 hours |
Flow estimate | MEDIUM: flow is normal/typical average flow |
Water Appearance | Muddy |
Stream depth | 1m - 2m |
Stream width | >5m |
Hazards | |
Litter/Pollutants | bottles,paper,plastic |
As this was our first time testing with this kit, some equipment turned out to be missing. Thus we were unable to test Ammonium or Dissolved Oxygen this time. Phosphate was tested twice, with the same result each time, however, we are are suspicious of a testing error as the result is very high. The June result has been far more reasonable.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au