Site visit details

Overview

Catchment Mitchell River
Site Macleod Morass - Outlet EG_MOR090
Date and Time Friday 6th June 2014 11:00am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Temp DIff ° C P mg/L Turb NTU
Sample 7 8500 7.5 0.07 17 13.7 9
Weather overcast
Last rainfall During the last 24 hours 5
Flow estimate STAGNANT: No continuous flow in channel but channel continuous (in-stream habitats connected)
Water Appearance Scummy
Stream depth 0 - 50cm
Stream width 2m - 5m
Hazards
Litter/Pollutants cans,packets

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au