Site visit details

Overview

Catchment South Gippsland
Site Tarwin Lower boat ramp, past pub. GC WG_TWN251
Date and Time Thursday 8th March 2012 14:30pm
Approved Approved

Notes

Physical Chemical Tests

EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 910 7.3 0.16 21.5 20.2 23
Weather sunny
Last rainfall During the last week
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Clear
Stream depth
Stream width
Hazards
Litter/Pollutants
P 1:2 dilution = 0.08 * 2

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au