Waterwatch Data Portal
ME_YDI810 Diamond Creek, Railway Pde, Eltham
21 June 2014
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Diamond Creek, Railway Pde, Eltham ME_YDI810 |
Date and Time | Saturday 21st June 2014 10:00am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.02 | 7 | 370 | 7.2 | 0.03 | 15.6 | 11.9 | 25 |
Weather | cloudy |
---|---|
Last rainfall | During the last 24 hours |
Flow estimate | MEDIUM: flow is normal/typical average flow |
Water Appearance | Muddy |
Stream depth | 0.95 |
Stream width | 10.0 |
Hazards | |
Litter/Pollutants | bottles,other |
Other litter included orange road safety mesh, car tyre, green webbing & foil. Sample water was shaken for turbidity test, filtered & warmed for Phosphate & Ammonium tests.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au