Waterwatch Data Portal
GB_CRE008 Creightons Creek d/s of Baronga Creek
15 June 2014
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Creightons Creek d/s of Baronga Creek GB_CRE008 |
Date and Time | Sunday 15th June 2014 12:00pm |
Approved | Approved |
Physical Chemical Tests
E coli orgs/100mL | EC µS/cm | pH pH Units | Rain mm | rP mg/L P | Water ° C | Coli orgs/100mL | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|
Sample | 140 | 19 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Rainfall: ~60mm in May, 42 mm in June including 26mm on the 13th of June EC: slightly less than May, especially downstream Turbidity: Higher at all sites Temperature 2.5 degrees greater than June 2013 (12 months ago)
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au