Waterwatch Data Portal
ME_YDI800 Diamond Creek @ Edendale Environment Centre footbridge
25 June 2014
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Diamond Creek @ Edendale Environment Centre footbridge ME_YDI800 |
Date and Time | Wednesday 25th June 2014 09:40am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.08 | 9 | 330 | 6.2 | 0.03 | 12.8 | 10.8 | 30 |
Weather | cloudy |
---|---|
Last rainfall | During the last 24 hours 9 |
Flow estimate | HIGH: Less than bankfull and in-stream habitats connected |
Water Appearance | Foamy/frothy |
Stream depth | 51cm - 99cm |
Stream width | >5m |
Hazards | |
Litter/Pollutants | bottles,cans,packets,paper,plastic |
Water was heated for testing. No bird life evident.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au