Site visit details

Overview

Catchment Barwon River
Site Cargerie Ck Crossing @ Concrete Bridge CO_CAR010
Date and Time Friday 31st January 2014 10:45am
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 6000 8 0.015 24 19 10
Weather cloudy
Last rainfall
Flow estimate POOLS: No continuous flow in channel and intermittent pools (in-stream habitats not connected)
Water Appearance Clear,Scummy
Stream depth 0 - 50cm
Stream width
Hazards
Litter/Pollutants plastic

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au