Waterwatch Data Portal
ME_ECN500 Cannibal Creek at Wimpole Rd, Garfield North
20 June 2014
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Cannibal Creek at Wimpole Rd, Garfield North ME_ECN500 |
Date and Time | Friday 20th June 2014 11:38am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 345 | 6.9 | 0.04 | 14 | 9 | 10 |
Weather | cloudy |
---|---|
Last rainfall | During the last week 11 |
Flow estimate | MEDIUM: flow is normal/typical average flow |
Water Appearance | Clear |
Stream depth | 0 - 50cm |
Stream width | >5m |
Hazards | |
Litter/Pollutants |
This monitoring was done about 2 weeks late. These results reflect the autumn period. Naomi Dart - Waterwatch Coordinator was present. Water level normal.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au