Site visit details

Overview

Catchment Mitchell River
Site Macleod Morass - Outlet EG_MOR090
Date and Time Monday 18th August 2014 15:46pm
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Temp DIff ° C P mg/L Turb NTU
Sample 66.3 9920 7.63 0.1 14.6 12.9 80
Weather cloudy
Last rainfall During the last week 30
Flow estimate STAGNANT: No continuous flow in channel but channel continuous (in-stream habitats connected)
Water Appearance Stained brown
Stream depth
Stream width
Hazards
Litter/Pollutants bottles,cans,plastic,polystyrene,waxed cardboard,other
wind: 22.3 cloud: 8 DO mg/L: 6.28

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au