Site visit details

Overview

Catchment Bunyip River
Site Toomuc Creek opposite the performing arts centre at Beaconhills College ME_ETO300
Date and Time Monday 15th September 2014 03:30am
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 0.05 410 7.6 0.04 17 14 17
Weather cloudy
Last rainfall During the last 24 hours 1
Flow estimate HIGH: Less than bankfull and in-stream habitats connected
Water Appearance Stained brown
Stream depth 0 - 50cm
Stream width 2m - 5m
Hazards
Litter/Pollutants plastic,polystyrene,other
large toy penguin toilet seat

Habitat

Bank Erosion Stability Bank Vegetation In Stream Cover Riffles Pools Bends Verge Vegetation Overall
Fair 3 Good 8 Good 8 Good 4 Good 8 Good 31

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au