Waterwatch Data Portal
ME_ETO300 Toomuc Creek opposite the performing arts centre at Beaconhills College
15 September 2014
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Toomuc Creek opposite the performing arts centre at Beaconhills College ME_ETO300 |
Date and Time | Monday 15th September 2014 03:30am |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|
Sample | 0.05 | 410 | 7.6 | 0.04 | 17 | 14 | 17 |
Weather | cloudy |
---|---|
Last rainfall | During the last 24 hours 1 |
Flow estimate | HIGH: Less than bankfull and in-stream habitats connected |
Water Appearance | Stained brown |
Stream depth | 0 - 50cm |
Stream width | 2m - 5m |
Hazards | |
Litter/Pollutants | plastic,polystyrene,other |
large toy penguin toilet seat
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au