Site visit details

Overview

Catchment Ovens River
Site Barwidgee Creek, DePiazza Lane, Mudgegonga LCG Site 4 NE_BAR045
Date and Time Wednesday 15th October 2014 18:35pm
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm Nitrate-Nit mg/L N pH pH Units rP mg/L P Water ° C Turb NTU
Sample 80.5 7.96 130 7.5 0.039 16.9 10
Weather sunny
Last rainfall
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Clear
Stream depth
Stream width
Hazards
Litter/Pollutants
Hi Vanessa are you still there? Lovely day sampling. DO tester worked well. Silting-up is still happening. Down to 12-14cm and silting upstream from the ford. What do I do when it gets too low to dip the sample bottle in? Dig a hole and sample from that? Stay home? Open Dave's dam to flush the stream? (I hope ASIO aren't listening) Well I suppose you don't have to worry. You have better things to focus on. Good luck. Cheers, Terry

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au