Waterwatch Data Portal
WG_HWC001 Heyfield Wetlands Site @ Stormwater Intake
20 September 2014
Site visit details
Overview
Catchment | Thomson River |
---|---|
Site | Heyfield Wetlands Site @ Stormwater Intake WG_HWC001 |
Date and Time | Saturday 20th September 2014 12:00pm |
Approved | Approved |
Physical Chemical Tests
EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|
Sample | 180 | 7 | 0.24 | 14 | 12 | 23 |
Weather | overcast |
---|---|
Last rainfall | During the last 24 hours 2 |
Flow estimate | MEDIUM: flow is normal/typical average flow |
Water Appearance | Clear |
Stream depth | 0 - 50cm |
Stream width | |
Hazards | |
Litter/Pollutants |
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au