Waterwatch Data Portal
MA_WDU750 Dunnings Wetland (Bridge Site)
1 November 2014
Site visit details
Overview
Catchment | Mallee |
---|---|
Site | Dunnings Wetland (Bridge Site) MA_WDU750 |
Date and Time | Saturday 1st November 2014 09:32am |
Approved | Approved |
Physical Chemical Tests
EC µS/cm | pH pH Units | rP mg/L P | Water ° C | Turb NTU | |
---|---|---|---|---|---|
Sample | 2990 | 7.2 | 0.05 | 18.9 | 55 |
Weather | cloudy |
---|---|
Last rainfall | During the last 24 hours 2.5 |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | Muddy |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au