Waterwatch Data Portal
GB_GOU095 Goulburn River at McCoys Bridge
26 November 2014
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Goulburn River at McCoys Bridge GB_GOU095 |
Date and Time | Wednesday 26th November 2014 11:00am |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | GB Height m | Nitrate-Nit mg/L N | pH pH Units | Rain mm | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|
Sample | 100 | 3.4 | 14 | 23 | 50 |
Weather | sunny |
---|---|
Last rainfall | During the last week 14 |
Flow estimate | HIGH: Less than bankfull and in-stream habitats connected |
Water Appearance | Stained brown |
Stream depth | >2m |
Stream width | >5m |
Hazards | |
Litter/Pollutants |
environmental flow river going back down
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au