Waterwatch Data Portal
NC_FMC450 Five Mile Creek, High St Woodend
29 November 2014
Site visit details
Overview
Catchment | Campaspe River |
---|---|
Site | Five Mile Creek, High St Woodend NC_FMC450 |
Date and Time | Saturday 29th November 2014 14:53pm |
Approved | Approved |
Physical Chemical Tests
EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|
Sample | 580 | 6.5 | 0.07 | 20.7 | 20.3 | 21 |
Weather | sunny |
---|---|
Last rainfall | During the last week 10 |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | Stained brown,Other: Suspended fine organic matter |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants | plastic |
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au