Waterwatch Data Portal
ME_YYD809 Chelsworth Overflow (stormwater capture draining to Reedy Billabong)
19 December 2014
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Chelsworth Overflow (stormwater capture draining to Reedy Billabong) ME_YYD809 |
Date and Time | Friday 19th December 2014 11:00am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | D.O. % | D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb FTU | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.18 | 4.65 | 750 | 7.3 | 0.09 | 25 | 17.8 | 20 | 15 |
Weather | cloudy |
---|---|
Last rainfall | More than a week ago |
Flow estimate | POOLS: No continuous flow in channel and intermittent pools (in-stream habitats not connected) |
Water Appearance | Milky |
Stream depth | 0 - 50cm |
Stream width | 1 |
Hazards | |
Litter/Pollutants |
Sufficient water at collection point to obtain viable sample.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au