Waterwatch Data Portal
ME_YYD809 Chelsworth Overflow (stormwater capture draining to Reedy Billabong)
19 February 2015
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Chelsworth Overflow (stormwater capture draining to Reedy Billabong) ME_YYD809 |
Date and Time | Thursday 19th February 2015 08:40am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | D.O. % | D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb FTU | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.13 | 7 | 610 | 7.1 | 0.12 | 20.5 | 19.5 | 13 | 9 |
Weather | overcast |
---|---|
Last rainfall | More than a week ago 30 |
Flow estimate | DRY: No continuous flow in channel and no pools |
Water Appearance | Clear |
Stream depth | 10-20 cm |
Stream width | 1 |
Hazards | |
Litter/Pollutants |
Water at collection point clear and still. Pools downstream but no sign of water movement. Oxygen high!
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au