Waterwatch Data Portal
ME_YDI810 Diamond Creek, Railway Pde, Eltham
25 April 2015
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Diamond Creek, Railway Pde, Eltham ME_YDI810 |
Date and Time | Saturday 25th April 2015 10:00am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.06 | 6 | 250 | 6.9 | 0.02 | 15.6 | 15.6 | 25 |
Weather | raining |
---|---|
Last rainfall | Raining Now |
Flow estimate | HIGH: Less than bankfull and in-stream habitats connected |
Water Appearance | Muddy |
Stream depth | 0.95 |
Stream width | 10.0 |
Hazards | |
Litter/Pollutants | other |
Other litter included car tyre (the 2nd one couldn't be seen due to the depth), orange safety mesh & green plastic webbing. Sample water was warmed for our phosphate & ammonium tests, shaken for the turbidity test.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au