Waterwatch Data Portal
ME_YYD808 Chelsworth Input (stormwater capture draining to Reedy Billabong)
15 May 2015
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Chelsworth Input (stormwater capture draining to Reedy Billabong) ME_YYD808 |
Date and Time | Friday 15th May 2015 08:45am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | D.O. % | D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb FTU | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.16 | 3.6 | 440 | 6.6 | 0.05 | 13 | 12 | 17 | 9 |
Weather | overcast |
---|---|
Last rainfall | During the last 24 hours 5 |
Flow estimate | PERMANENT: wetlands and lakes |
Water Appearance | Clear |
Stream depth | 51cm - 99cm |
Stream width | 50 |
Hazards | |
Litter/Pollutants |
Creatures Waterwatch method
Total bug score | ||
---|---|---|
Total abundance | 0 - 35 | 35+ |
0 - 200 | Poor | Good |
200+ | Fair | Very good |
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au