Site visit details

Overview

Catchment Yarra River
Site Chelsworth Overflow (stormwater capture draining to Reedy Billabong) ME_YYD809
Date and Time Friday 15th May 2015 09:30am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb FTU Turb NTU
Sample 0.03 5.7 350 6.7 0.01 14 13.2 9
Weather overcast
Last rainfall During the last 24 hours 5
Flow estimate HIGH: Less than bankfull and in-stream habitats connected
Water Appearance Clear
Stream depth 0 - 50cm
Stream width 2m - 5m
Hazards
Litter/Pollutants
Water flowing out of overflow pipe

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au