Waterwatch Data Portal
GB_DRY003 Dry Creek at Broadford-Wandong Road, Wandong
28 May 2015
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Dry Creek at Broadford-Wandong Road, Wandong GB_DRY003 |
Date and Time | Thursday 28th May 2015 09:30am |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | pH pH Units | Rain mm | rP mg/L P | Water ° C | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|
Sample | 160 | 0 | 9.7 | 31 |
Weather | overcast |
---|---|
Last rainfall | During the last week 10 |
Flow estimate | STAGNANT: No continuous flow in channel but channel continuous (in-stream habitats connected) |
Water Appearance | Muddy |
Stream depth | 51cm - 99cm |
Stream width | >5m |
Hazards | |
Litter/Pollutants |
Kirsten Hogan met with Sandra Moran 21/5/15 and checked equipment and method and did QAQC against coordinator equipment. Provided new batteries, distilled water and EC calibration solution.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au