Site visit details

Overview

Catchment Goulburn River
Site Dry Creek at Broadford-Wandong Road, Wandong GB_DRY003
Date and Time Thursday 28th May 2015 09:30am
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L EC µS/cm pH pH Units Rain mm rP mg/L P Water ° C P mg/L Turb NTU
Sample 160 0 9.7 31
Weather overcast
Last rainfall During the last week 10
Flow estimate STAGNANT: No continuous flow in channel but channel continuous (in-stream habitats connected)
Water Appearance Muddy
Stream depth 51cm - 99cm
Stream width >5m
Hazards
Litter/Pollutants
Kirsten Hogan met with Sandra Moran 21/5/15 and checked equipment and method and did QAQC against coordinator equipment. Provided new batteries, distilled water and EC calibration solution.

Habitat

Bank Erosion Stability Bank Vegetation In Stream Cover Riffles Pools Bends Verge Vegetation Overall
Good 4 Poor 4 Poor 4 Good 4 Poor 4 Fair 20

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au