Site visit details

Overview

Catchment Goulburn River
Site Mollison Creek at Weir Wall Power St, Pyalong GB_MOL005
Date and Time Thursday 25th June 2015 11:00am
Approved Approved

Notes

Physical Chemical Tests

EC µS/cm Rain mm Air ° C Water ° C Turb NTU
Sample 1310 5 9.7 9.2 8
Weather cloudy
Last rainfall During the last week 5
Flow estimate POOLS: No continuous flow in channel and intermittent pools (in-stream habitats not connected)
Water Appearance Clear
Stream depth >2m
Stream width 2m - 5m
Hazards
Litter/Pollutants

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au