Site visit details

Overview

Catchment Bunyip River
Site Sunshine Creek at upper site on left side of split ME_ESU100
Date and Time Monday 20th July 2015 10:40am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N D.O. % D.O mg/L EC µS/cm FrP mg/L P Nitrate-Nit mg/L N pH pH Units rP mg/L P Air ° C Water ° C Turb NTU
Sample 50 6 1320 5.6 0.04 7 7 20
Weather sunny
Last rainfall During the last 24 hours 0.2
Flow estimate STAGNANT: No continuous flow in channel but channel continuous (in-stream habitats connected)
Water Appearance Clear
Stream depth 0 - 50cm
Stream width 0.3
Hazards muddy banks, overgrown vegetation
Litter/Pollutants
Low Ph reading; Low DO reading; high turbidity.

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au