Waterwatch Data Portal
ME_ESU300 Sunshine Creek at Frankston school steps bridge, Mt Martha
20 July 2015
Site visit details
Overview
Catchment | Bunyip River |
---|---|
Site | Sunshine Creek at Frankston school steps bridge, Mt Martha ME_ESU300 |
Date and Time | Monday 20th July 2015 11:30am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 65 | 8 | 290 | 8.3 | 0.03 | 8 | 5 | 7 |
Weather | sunny |
---|---|
Last rainfall | During the last 24 hours 0.2 |
Flow estimate | HIGH: Less than bankfull and in-stream habitats connected |
Water Appearance | Clear,Stained brown |
Stream depth | 51cm - 99cm |
Stream width | 2m - 5m |
Hazards | steep slope, slippery rocks beside creek |
Litter/Pollutants | bottles,plastic |
Significant vegetation disturbance under bridge as part of bridge repair preparations conducted by SE Water.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au