Waterwatch Data Portal
GB_SUG018 Sugarloaf Creek at Pyalong-Tallarook Rd
20 July 2015
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Sugarloaf Creek at Pyalong-Tallarook Rd GB_SUG018 |
Date and Time | Monday 20th July 2015 09:30am |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | E coli orgs/100mL | EC µS/cm | pH pH Units | Rain mm | rP mg/L P | Air ° C | Water ° C | Coli orgs/100mL | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 77 | 9.7 | 361 | 1130 | 7.3 | 0.2 | 6.4 | 6.5 | 2420 | 5.3 |
Weather | |
---|---|
Last rainfall | During the last week 17.6 |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | Clear |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Sunny with a few clouds. Crispy cold morning minus 2 degrees overnight. First time site has been flowing for a long time. E.coli sample taken. Rain10-7-15 = 1.6mm 11-7-15 = 9mm 12-7-15 = 6.4 mm 13-7-15 = 5.6 mm 14-7-15= 0.8mm 15-7-15 = 11mm 16-7-15 = 0 mm 17-7-15 = 0 mm 18-7-15 = 0 mm 19-7-15 = 0.2 mm 20-7-15 = 0 mm
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au