Site visit details

Overview

Catchment Yarra River
Site Chelsworth Input (stormwater capture draining to Reedy Billabong) ME_YYD808
Date and Time Friday 17th July 2015 10:00am
Approved Approved

Notes

Physical Chemical Tests

Ammon-Nit mg/L NH3-N D.O. % D.O mg/L EC µS/cm pH pH Units rP mg/L P Air ° C Water ° C Turb FTU Turb NTU
Sample 0.26 10.3 300 7.3 0.05 9.5 10 39 40
Weather raining
Last rainfall Raining Now 2
Flow estimate HIGH: Less than bankfull and in-stream habitats connected
Water Appearance Other: grey
Stream depth 1
Stream width 2m - 5m
Hazards
Litter/Pollutants

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au