Waterwatch Data Portal
ME_YYD808 Chelsworth Input (stormwater capture draining to Reedy Billabong)
17 July 2015
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Chelsworth Input (stormwater capture draining to Reedy Billabong) ME_YYD808 |
Date and Time | Friday 17th July 2015 10:00am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | D.O. % | D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb FTU | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.26 | 10.3 | 300 | 7.3 | 0.05 | 9.5 | 10 | 39 | 40 |
Weather | raining |
---|---|
Last rainfall | Raining Now 2 |
Flow estimate | HIGH: Less than bankfull and in-stream habitats connected |
Water Appearance | Other: grey |
Stream depth | 1 |
Stream width | 2m - 5m |
Hazards | |
Litter/Pollutants |
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au