Waterwatch Data Portal
GB_WTB004 Pig Paddock Jetty at Tahbilk Wetlands
30 April 2015
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Pig Paddock Jetty at Tahbilk Wetlands GB_WTB004 |
Date and Time | Thursday 30th April 2015 10:10am |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | pH pH Units | Rain mm | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|
Sample | 66 | 6.6 | 65 | 0 | 16.6 | 14.4 | 3.8 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
pH meter reading low so not included - meter was replaced 19-05-15 after this sample tested.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au