Waterwatch Data Portal
ME_YDI810 Diamond Creek, Railway Pde, Eltham
29 August 2015
Site visit details
Overview
Catchment | Yarra River |
---|---|
Site | Diamond Creek, Railway Pde, Eltham ME_YDI810 |
Date and Time | Saturday 29th August 2015 10:00am |
Approved | Approved |
Physical Chemical Tests
Ammon-Nit mg/L NH3-N | N mg/L NH4+ | D.O. % | D.O mg/L | EC µS/cm | FrP mg/L P | Nitrate-Nit mg/L N | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|---|---|
Sample | 0.1 | 6 | 620 | 6.67 | 0.07 | 11.6 | 11.6 | 120 |
Weather | overcast |
---|---|
Last rainfall | During the last 24 hours |
Flow estimate | HIGH: Less than bankfull and in-stream habitats connected |
Water Appearance | Muddy |
Stream depth | 1.5 |
Stream width | 10.0 |
Hazards | |
Litter/Pollutants | cans,other |
Other litter, as the water level was high the litter was covered by the water level. Sample water was filtered & warmed for phosphate & ammonium tests plus shaken for the turbidity test.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au