Waterwatch Data Portal
Site visit details
Overview
Catchment | Gellibrand River |
---|---|
Site | La Trobe Creek Bourkes Drain CO_GEL048 |
Date and Time | Sunday 11th January 2015 15:00pm |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | Turb FTU | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|
Sample | 75 | 6.6 | 8500 | 7 | 0.06 | 23 | 24 | 28 |
Weather | cloudy |
---|---|
Last rainfall | During the last 24 hours |
Flow estimate | FLOOD / OVERBANK: flow is high and water level has exceeded bank capacity and is connecting with floodplain |
Water Appearance | Smelly,Stained brown |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au