Waterwatch Data Portal
CO_WAU012 Waurn Ponds Creek @ Cobbin Farm
31 March 2015
Site visit details
Overview
Catchment | Barwon River |
---|---|
Site | Waurn Ponds Creek @ Cobbin Farm CO_WAU012 |
Date and Time | Tuesday 31st March 2015 11:30am |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | pH pH Units | rP mg/L P | Air ° C | Water ° C | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|
Sample | 72 | 7 | 2750 | 6.5 | 0.045 | 20 | 15 | 10 |
Weather | sunny |
---|---|
Last rainfall | During the last week 1 |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | Clear |
Stream depth | 0 - 50cm |
Stream width | <2 |
Hazards | |
Litter/Pollutants |
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au