Waterwatch Data Portal
GB_GRO030 Groundwater bore at Jeff Swain’s property
24 August 2015
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Groundwater bore at Jeff Swain’s property GB_GRO030 |
Date and Time | Monday 24th August 2015 08:30am |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | EC µS/cm | Nitrate-Nit mg/L N | pH pH Units | Rain mm | Water ° C | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|
Sample | 1270 | 5 | 0 | 12 | 2 |
Weather | |
---|---|
Last rainfall | |
Flow estimate | |
Water Appearance | |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
Nitrate sample taken. - David Hodgkins said to analyse nitrate this and last month and see how results are, but if low, then stop testing for Nitrate. Previous results have been very low, and are not considered a problem.
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au