Waterwatch Data Portal
GB_SUN023 Sunday Creek at driveway into 110 Ashes Bridge Track, Hilldene.
17 November 2014
Site visit details
Overview
Catchment | Goulburn River |
---|---|
Site | Sunday Creek at driveway into 110 Ashes Bridge Track, Hilldene. GB_SUN023 |
Date and Time | Monday 17th November 2014 10:30am |
Approved | Approved |
Physical Chemical Tests
D.O. % | D.O mg/L | E coli orgs/100mL | EC µS/cm | Rain mm | Air ° C | Water ° C | Coli orgs/100mL | P mg/L | Turb NTU | |
---|---|---|---|---|---|---|---|---|---|---|
Sample | 680 | 0 | 16.6 | 0.04 | 28 |
Weather | sunny |
---|---|
Last rainfall | During the last week 45 |
Flow estimate | LOW: Minimum flow in channel/continuous flow in some part of channel (in-stream habitats connected) |
Water Appearance | Stained brown |
Stream depth | |
Stream width | |
Hazards | |
Litter/Pollutants |
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License
Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au