Site visit details

Overview

Catchment Goulburn River
Site Sunday Creek at driveway into 110 Ashes Bridge Track, Hilldene. GB_SUN023
Date and Time Monday 20th July 2015 10:15am
Approved Approved

Notes

Physical Chemical Tests

D.O. % D.O mg/L E coli orgs/100mL EC µS/cm Rain mm Air ° C Water ° C Coli orgs/100mL P mg/L Turb NTU
Sample 133 910 0 7 2420 20
Weather sunny
Last rainfall More than a week ago
Flow estimate MEDIUM: flow is normal/typical average flow
Water Appearance Stained brown
Stream depth
Stream width
Hazards
Litter/Pollutants
First flow 19 July

Habitat

Bank Erosion Stability Bank Vegetation In Stream Cover Riffles Pools Bends Verge Vegetation Overall
Fair 3 Fair 6 Fair 6 Fair 3 Poor 4 Fair 22

Diary photos

No diary entries recorded for this visit

Creative Commons CC BY
All content, files, data and images provided by the Waterwatch Data Portal and Gallery are subject to a Creative Commons Attribution License

Content is made available to be used in any way, and should always attribute Waterwatch and www.vic.waterwatch.org.au